
RECONFIGURATION SE SANTA COLOMA 220 kV
RECONFIGURATION SE SANTA COLOMA 220 kV
Environmental supervision of the construction work for the renewal of the GRAMENET electrical substation. This renewal consists in transferring all the conventional positions of the outdoor park to the GIS-type shielded installations.